chore(release): 2.0.1

2 jobs for v2.0.1 in 2 minutes and 33 seconds (queued for 2 seconds)
latest
Status Name Job ID Coverage
  Lint
passed lint #49736

00:01:26

 
  Release
passed release:prod_tag #49737

00:01:07

 

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).